Teachers:ESD Erasmus Project 2013: Difference between revisions

m
No edit summary
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
* [http://ec.europa.eu/education/llp/doc/call13/fiches/era11_en.pdf Explanations on the actions - ERASMUS Academic Networks]
* [http://ec.europa.eu/education/llp/doc/call13/fiches/era11_en.pdf Explanations on the actions - ERASMUS Academic Networks]


The programme is open to:
==LLP Countries==
* the 27 EU Member States
* the 27 EU Member States
* Iceland, Liechtenstein, Norway  
* Iceland, Liechtenstein, Norway  
* Turkey, Croatia
* Turkey, Croatia
* Switzerland
* Switzerland
* Former Yugoslav Republic of Macedonia and Serbia
* Albania,  Bosnia and Herzegovina and Montenegro may become eligible to participate in the Lifelong Learning Programme Call 2013 as full partners, provided that the formal steps for participation for each country are completed in due time.


=== Third countries ===
=== Third countries ===
Line 83: Line 85:


[[LLP Table 5a - Maximum eligible daily rates]]
[[LLP Table 5a - Maximum eligible daily rates]]
===Subsistence Costs===
(1) Subsistence costs for staff undertaking travel to another participating country in the framework of Multilateral projects, Networks and Accompanying Measures are eligible. The budget should be based on the maximum rate in the Subsistence Costs table 5b below. Any surplus will be considered as ineligible. The rate to be applied is
the one of the country of destination, i.e. where accommodation costs are incurred.
(2) Costs may be claimed only for journeys directly connected to specific and clearly identifiable project-related activities. For information on charging Subsistence Costs for non-staff members please refer to Section ‘Other Costs’ and ‘Subcontracting Costs’.
(3) Reimbursement is based on the existing internal rules of the Partner organisations, which may be on an actual cost (reimbursement of receipts) or daily allowance basis. In either case, proof of attendance and overnight accommodation will be required to substantiate declared costs at reporting stage.
(4) Subsistence rates cover accommodation, meals and all local travel costs at the place of destination abroad (but not local travel costs incurred to travel from place of origin to place of destination). In calculating the number of days for which to apply the Daily Subsistence Rate it should be noted that a FULL day normally includes an overnight stay. In duly substantiated cases, a full day’s allowance without an overnight stay may be allowed with a pro rata reduction (costs limited to 50% of the maximum) for accommodation.
(5) A pro rata reduction must be applied if accommodation, meals and local travel costs are provided for by a third party. Eligible subsistence costs are calculated on the basis of scales of eligible unit costs. The Subsistence costs in Table 5b represent the maximum eligible daily rates. The resulting amounts will be included in the budget and will be taken into account when calculating the European Union contribution.
[[LLP Table 5b -  Maximum eligible daily rates]]
===Travel Costs===
Travel costs are allocated on the basis of real costs.
(1) Travel costs for staff taking part in the project are allowable, provided that they are in line with each partner’s usual practices on travel costs.
(2) Costs may be claimed only for journeys directly connected to specific and clearly identifiable project-related activities. For information on charging Travel Costs for
non staff members please refer to Section "Other Costs" and "Subcontracting Costs".
(3) The travel cost for a journey should include all costs and all means for travel from the point of origin to the point of destination (and vice versa) and may include visa fees, travel insurance and cancellation costs.
(4) Reimbursement is based on real costs, independent of the means of travel chosen (rail, bus, taxi, plane, hire car). Partners are required to use the cheapest means of
travel (e.g. use best value for money tickets for air travel and take advantage of reduced fares, where this is not the case then a full explanation should be provided).
(5) Expenses for private car travel (personal or company cars), where substantiated and where the price is not excessive, will be refunded as follows (whichever is the
cheapest):
* Either a rate per km in accordance with the internal rules of the organisation concerned up to a max of €0.22;
* Or the price of a rail, bus or plane ticket (see point (3) above). Only one ticket shall be reimbursed, independently of the number of people travelling in the same vehicle.
(6) For hire cars (maximum category B or equivalent) or taxis: the actual cost where this is not excessive compared with other means of travel (also taking account of
any influencing factors such as time, large volume of luggage due to the nature of the project). Reimbursement takes place independently of the number of people travelling in the same vehicle.
===Equipment costs===
(1) Purchase, rent or lease of equipment (new or second-hand), including the installation, maintenance and insurance costs, is considered eligible
* only when specific and necessary for achieving the goals of the project/action. Proposed equipment costs must always be clearly explained and specifically
justified. The rules for procurement apply (see "Subcontracting costs" below);
* provided that, in case of purchase only, the equipment is depreciated in accordance with the tax and accounting rules applicable to the beneficiary / consortium partner incurring the cost, and generally accepted for items of the same kind. Only the portion of the equipment's depreciation corresponding to the duration of the action and the rate of actual use for the purposes of the action may be taken into account. The applicant must explain the rules applied. If the nature and/or the context of its use justify different treatment, this should be duly justified.
(2) All equipment related to the administration of the project (i.e. PC's, portables, etc.) and all equipment purchased before the start of a project can be covered only by the indirect costs of the project.
(3) The total cost for equipment may not be more than 10% of the eligible direct costs of the project.
(4) Third Country partners cannot claim Equipment costs
¨
===Subcontracting costs===
(1) Costs entailed by procurement contracts for the purposes of carrying out specific and limited work for the project, can be considered eligible when awarded by a
partner to an external body, organisation or individual (only if not employed by any of the Partner organisations of the consortium). This includes work such as
translation, interpretation and printing, etc.
(2) In order to maintain the concept of the project partnership, the management and the general administration of the project may not be subcontracted.
(3) Costs are based on a verifiable estimate or, if the subcontractor is identified in accordance with the procedures set out in 4 and 5 below, on the basis of an offer. The estimate/offer will cover all costs (i.e. staff costs plus travel costs, etc.).
(4) The beneficiary will award the contract to the tender offering best value for money, or, as appropriate, to the tender offering the lowest price, in compliance with the principles of transparency and equal treatment for potential contractors, care being taken to avoid any conflict of interests.
(5) For actions managed through the Commission Procedure, the following specific
European Union rules with regard to procurement apply:
* Payments of amounts not exceeding EUR 1.000 in respect of items of expenditure may consist simply in payment against invoices, without prior acceptance of a tender;
* Contracts with a value over €1.000 and not exceeding €15.000 are subject to a procedure involving a single tender following a negotiated procedure without prior publication of a contract notice;
* Contracts with a value over €15.000 and not exceeding €60.000 are subject to a procedure involving at least three tenderers following a negotiated procedure
without prior publication of a contract notice;
* For contracts of a value over €60.000, national rules with regard to procurement apply.
(6) The total costs for subcontracting may not be more than 30 % of the total direct costs of the project
(7) Third Country partners cannot claim Subcontracting costs
===Other Costs===
Other costs are allocated on the basis of real costs.
(1) The category "Other costs" can only contain costs incurred by the partners themselves.
(2) Costs arising directly:
* from requirements imposed by the Grant Agreement are eligible(dissemination of information, specific evaluation of the action, audits, reproduction, translation etc.), including the costs of any financial services (notably the cost of financial guarantees);
* from the realisation of specific activities or of products/results of the project are eligible (e.g. the organisation of seminars where the seminar is foreseen as a product/result and where task-related costs are easily identifiable), the production of proceedings of a seminar, the production of a video, the purchase of product-related consumables (reams of paper for printing of publications, blank DVD), etc.
(3) All costs incurred through subcontracting must be mentioned under the "subcontracting" category
(4) Only activities which are specific and necessary for achieving the goals of the project are considered eligible. Proposed costs must always be duly justified.
(5) When travel and/or subsistence costs are reimbursed to third parties (i.e. for the costs of people who are neither staff of the partners in the consortium, nor
subcontractors), the rules applicable to the reimbursement of costs for staff of the partners in the consortium will be applied.
(6) In certain cases, other costs which are not covered by the other cost categories mentioned above may also be considered eligible. Some examples are: one-off
costs for press releases and publicity, purchase of copyrights and other Intellectual Property Rights, purchase of information materials (books, studies and electronic
data); conference fees; registration fees for conferences; rental of exhibition space, etc. Also Travel costs and subsistence costs for Comenius Multilateral projects
involving mobility activities during Initial Teacher Training are covered under this heading.
All costs related to the administration of the project (i.e. consumables, supplies, photocopying costs, telephone costs, paper, etc.) are covered by indirect costs of the
project.