Case study: The Battle for Jezeří Chateau: Difference between revisions

Line 228: Line 228:


Tours of the building take place at the same time reconstruction work is being carried out so that the chateau management is forced to adapt to situations as they arise. An important change in the tour circuit resulted from the erosion of the painted timbered ceiling on the second floor of the northern tower when it was necessary move the inventory and look for another suitable type of tour circuit. This happened in January 2004. Given that partial reconstruction of the ground floor of the lord’s manor had been completed, which permitted the use of this space for a cash desk and facilities for visitors, the entrance to the chateau was able to be moved from the inner forecourt. The inventory was moved to the southern part of the chateau, which had already been stabilised by the reconstruction work undertaken on the roof and ceilings.
Tours of the building take place at the same time reconstruction work is being carried out so that the chateau management is forced to adapt to situations as they arise. An important change in the tour circuit resulted from the erosion of the painted timbered ceiling on the second floor of the northern tower when it was necessary move the inventory and look for another suitable type of tour circuit. This happened in January 2004. Given that partial reconstruction of the ground floor of the lord’s manor had been completed, which permitted the use of this space for a cash desk and facilities for visitors, the entrance to the chateau was able to be moved from the inner forecourt. The inventory was moved to the southern part of the chateau, which had already been stabilised by the reconstruction work undertaken on the roof and ceilings.
==The battle begins anew==


==Resources==
==Resources==
994

edits